December 18, 2025
Well, the project is winding down. Tomorrow will probably be the last day until the handrails arrive. These are expected between Christmas and New years. You will not be given notice of their arrival as the office is closed for a period of time and people are busy with holidays. You will just see workers coming to do the installation.
The fencing will remain up until the railings are installed.
We are sorry for the delay, but cannot control manufacturing in this case. The delay could be partly contributed to our late decision regarding the type of railing.
The stone splash pads in the Albert Franck garden will be reset when the soil removal people come to take down the level of soil in that garden.
The stones have been levelled. They are slightly raised in a few places but are expected to settle with use. If not, we will have that corrected in the future.
You are probably wondering about the pipes sticking out from the wall of the “tot lot” … they are the drainage pipes for the tot lot and are extended out to keep the water away from the wall of the lot. They were there before but shorter so we probably did not notice them. If they become problematic we can always have them cut down a bit. Maybe the tot lot sub committee can incorporate them into the overall design of the lot ( lol ). Reminds me of a space ship about to take off.
Anyway… that’s all folks.
Have a great holiday season
Mary
On behalf of the Board