{"id":19524,"date":"2025-08-21T18:10:34","date_gmt":"2025-08-21T22:10:34","guid":{"rendered":"https:\/\/www.woodsworthcoop.ca\/?p=19524"},"modified":"2026-09-18T13:22:21","modified_gmt":"2026-09-18T17:22:21","slug":"notice-woodsworth-podium-deck-work","status":"publish","type":"post","link":"https:\/\/www.woodsworthcoop.ca\/index.php\/notice-woodsworth-podium-deck-work\/","title":{"rendered":"Notice: Woodsworth Podium Deck Work"},"content":{"rendered":"<div dir=\"ltr\" data-setdir=\"false\">\n<p>Emailed \u00a0to members on August 21, 2025<\/p>\n<p>Dear Members,<\/p>\n<\/div>\n<div dir=\"ltr\" data-setdir=\"false\">\n<div>\n<div>Please be advised that work on the podium deck project will commence <span dir=\"ltr\">on August 25th, 2025, at 8AM<\/span> and will be ongoing until December 2025. The work will take place along the back of Wilton St. units at the ground level, and along the breezeway going out towards Albert Franck. For now, the work is expected to continue during weekdays only.<\/div>\n<div><\/div>\n<div>\n<p>Be aware that construction will cause significant noise, vibration, dust, and odour.<\/p>\n<\/div>\n<div>The construction area will be off-limits to all members and residents during this time. This is for your safety and the safety of others. The front entrance will always be accessible during construction, though specific access pathways for residents will be created as necessary.<\/div>\n<div><\/div>\n<div>There will be an upcoming member\u2019s forum with the contractor, project manager and Management to discuss the project and answer member\u2019s questions and concerns. As this is a time sensitive project, the work will need to start on the mentioned date.<\/div>\n<\/div>\n<\/div>\n<div><\/div>\n<div class=\"ydp15627555signature\">\n<div>\n<div>\n<div dir=\"ltr\">If you have any questions, please don&#8217;t hesitate to contact the office.<\/div>\n<div dir=\"ltr\"><\/div>\n<div dir=\"ltr\"><b>Best Regards,<\/b><\/div>\n<div dir=\"ltr\"><b>Woodsworth Team<\/b><\/div>\n<div><\/div>\n<div><b>Woodsworth Housing Co-operative Inc.<\/b><\/div>\n<p><b><span dir=\"ltr\">133 Wilton Street, Suite #201<\/span><br \/>\n<span dir=\"ltr\">Toronto, ON M5A 4A4<\/span><\/b><\/p>\n<\/div>\n<div dir=\"ltr\"><b>T: <span dir=\"ltr\">(416)-363-3418<\/span><\/b><\/div>\n<div dir=\"ltr\"><b>\u00a0<\/b><\/div>\n<div dir=\"ltr\">Please allow us <b>1 to 2 business days<\/b> to respond to your email.<br \/>\n<span style=\"font-family: Helvetica, Arial, sans-serif;\"><br \/>\n<\/span>Please contact on-call at<\/div>\n<div dir=\"ltr\"><b><span dir=\"ltr\">(1)877-858-1110<\/span> #4\u00a0<\/b>outside office hours.<\/div>\n<div dir=\"ltr\"><span style=\"font-family: Helvetica, Arial, sans-serif;\"><br \/>\n<\/span>If you want to reach the maintenance team please contact them at <b><span dir=\"ltr\">416-363-7542<\/span>.<\/b><b><br \/>\n<\/b><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Emailed \u00a0to members on August 21, 2025 Dear Members, Please be advised that work on the podium deck project will commence on August 25th, 2025, at 8AM and will be ongoing until December 2025. The work will take place along the back of Wilton St. units at the ground level, and along the breezeway going &hellip; <a href=\"https:\/\/www.woodsworthcoop.ca\/index.php\/notice-woodsworth-podium-deck-work\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Notice: Woodsworth Podium Deck Work&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[669],"tags":[673],"class_list":["post-19524","post","type-post","status-publish","format-standard","hentry","category-capital-projects-completed","tag-capital-projects-completed"],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/posts\/19524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/comments?post=19524"}],"version-history":[{"count":0,"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/posts\/19524\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/media?parent=19524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/categories?post=19524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.woodsworthcoop.ca\/index.php\/wp-json\/wp\/v2\/tags?post=19524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}